Duhai Depot RRTS station

RapidX's Delhi–Meerut terminal RRTS depot station

Preceding station RapidX Following station
Duhai
towards Sahibabad
Delhi–Meerut Terminus
Future Service
Duhai Delhi–Meerut
(Future Service)
Terminus
Route map
Legend
Jangpura
Old NH 19 (Mathura Road)
Indian Railways
Baba Banda Singh Bahadur Setu
Sarai Kale Khan
Hazrat Nizamuddin railway station Sarai Kale Khan Inter-State Bus Terminus Pink Line
(Barapullah Flyover)
NH44-IN.svg NH 44 (Srinagar–Kanyakumari Highway)
Yamuna River
Mayur Vihar Flyover
Shahdara Canal
New Ashok Nagar
Blue Line
Ghazipur Canal
Anand Vihar
Anand Vihar Terminal railway station Swami Vivekanand Interstate Bus Terminus Pink Line Blue Line
Delhi
Uttar Pradesh
border
Sahibabad
Indian Railways
Ghaziabad
Red Line
Guldhar
Duhai
Duhai Depot
Murad Nagar
Modinagar South
Modinagar North
Meerut South
Indian Railways
Shatabdi Nagar
NH334B-IN.svg NH 334B
Begumpul
NH709A-IN.svg NH 709A
Modipuram
Modipuram Depot
[1]
Location
Map

Duhai Depot RRTS station[2] is an At-Grade terminal RRTS station in Uttar Pradesh, India. This will serve as a RRTS station for higher-speed trains on the Delhi–Meerut Regional Rapid Transit System that can reach speeds of up to 180 km/h. This will be the depot for all Namo Bharat trainsets for maintenance purposes.

Duhai Depot RRTS station was commissioned on 20 October 2023 by Prime Minister Narendra Modi along with the 17 km long Sahibad-Duhaiyya section of Delhi–Meerut RRTS[3][4] and was open to general public on 21 October 2023.[5][6][7]

History

The National Capital Region Transport Corporation (NCRTC) had invited tenders for the construction of the Duhai Depot RRTS station along with the 1.9 km long Duhai ramp–Duhai Depot section of the 82.15 km Delhi-Meerut RRTS line. Vijay Nirman Co. and KEC International (JV) emerged as the lowest bidder for construction work. As a result, under the agreement, companies started construction of Duhai Depot RRTS station.[8]

Station layout

The Duhai Depot RRTS station will have one level - platform with concourse and street level. Duhai Depot RRTS station will be 215 meters long and 26 meters wide.[9]

Duhai Depot track layout
Legend
P2
P1
to Train Terminates Here **
Station with two tracks and two side platforms
** Duhai Depot for Maintenance
G Street level & Mezzanine Exit/Entrance, Fare control, Station agent, Token vending machines, Crossover
P Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Train Terminates Here
Platform 2
Westbound
Towards ← Sahibabad next station is Duhai
(Passengers heading towards Modipuram may alight at the next station)
Side platform | Doors will open on the left Disabled access
P

References

  1. ^ "Delhi – Meerut RRTS – Information, Route Map, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 16 October 2023.
  2. ^ "DELHI-Ghaziabad-Meerut MAP". ncrtc.in. Retrieved 1 May 2023.
  3. ^ Abhijay Jha. "RRTS section nears launch, but links to metro, bus stand will take longer". timesofindia.indiatimes.com. The Times of India. Retrieved 1 May 2023.
  4. ^ "Delhi-Meerut RRTS corridor: Duhai-Sahibabad section likely to open for public by April – Details inside". www.financialexpress.com. Retrieved 1 May 2023.
  5. ^ Livemint (20 October 2023). "PM Modi inaugurates the priority section of Delhi-Ghaziabad-Meerut RRTS Corridor". mint. Retrieved 2 January 2024.
  6. ^ DHNS. "PM Modi flags off NaMo Bharat, India's 1st Regional Rapid Rail Service (RRTS) | Details here". Deccan Herald. Retrieved 2 January 2024.
  7. ^ Reporter, Staff (20 October 2023). "PM Narendra Modi Flags off India's First Namo Bharat Train on Delhi-Meerut RRTS Corridor". Metro Rail News. Retrieved 2 January 2024.
  8. ^ "APCO-CRFG & KEC-CCECC Resume Work on Delhi – Meerut RRTS Line". www.themetrorailguy.com. The Metro Rail Guy. Retrieved 1 May 2023.
  9. ^ "Delhi-Meerut RRTS update: Ghaziabad station to have 5 exits, to be linked with Naya Bus Stand Metro Station". www.msn.com. Retrieved 1 May 2023.